Ongoing Project:
32 MW Turbine Installation

- Ongoing Project
- Franco Tosi Meccanica

5MW Solar Power Plant
- Konya / Türkiye
- 10-2023 / 01-2024
- 5ER Enerji Tarım Hayvancılık A.Ş.
The 5MW Solar Power Plant in Çumra/Konya, owned by 5ER ENERJİ, was successfully completed by our company and put into operation in 4 months.
New Ammonia Plant

- Balıkesir / Türkiye
- 02-2018 / 11-2018
- CARGILL Tarım ve Gıda San. Tic. A.Ş
In this project, 36 kV metal enclosed medium voltage panel is integrated into existing distribution center. Also 2000 kV A 34,5/0,4kV cast resin transformer has been installed in Ammonia Plant. Connection between medium voltage panel and transformer is made with 200m, 3x (1×95 /16) mm2 XLPE cable. Low voltage side of transformer and Ammonia MCC panel is connected with 3000A Al busbar. All electrical engineering calculations in Ammonia plant are made with the best and most comprehensive softwares.
This project is a turnkey project which consist E&I, lightning and grounding systems.
Busduct & TRK 5

- Yalova / Türkiye
- 04-2018 / 06-2018
- AKSA Akrilik Kimya San. A.Ş.
The scope of the project is the integration of the 81.25MVA power transformer and 10,5kV Busduct into the existing system.The aim of this work is, to use existing 99MWe MAN Turbine more efficiently and flexible. 10.5/34.5kV 65/81,25MVA TRK5 Transformer has been installed in order to supply the produced energy to the transmission line and the exisitng consumption busbar line of 34.5 kV system.In this project, connections with consumption line,generation line and transmisison line is made with 10,5kV,120kA, 6600A BUSDUCT